References |
Myshenkov, K.A., Romanov, A.U., A method for solving the scheduling problem for company equipment repair process using a genetic algorithm (2011) Science and Education: E-science Technical Publication, (9). , http://technomag.edu.ru/doc/212208.html, (accessed 25.02.2013); Sriprasert, E., Dawood, N., Genetic algorithms for multiconstrained scheduling: An application for the construction industry (2003) Proc. CIB W78's 20th International Conference on Construction IT, Construction IT Bridging the Distance, CIB Report 284. Waiheke Island, pp. 341-353; Hartmann, S., Drexl, A., Project scheduling with multiple modes: A comparison of exact algorithms (1998) Networks, 32 (4), pp. 283-297; Emelyanov, V.V., Kureichik, V.V., Kureichik, V.M., (2003) Theory and Practice of Evolutionary Modeling, , Moscow, FIZMATLIT; Osaba, E., Carballedo, R., Diaz, F., Simulation tool based on a memetic algorithm to solve a real instance of a dynamic TSP (2012) Proc. IASTED International Conference Applied Simulation and Modelling, pp. 27-33. , Napoli; Aksyonov, K.A., Antonova, A.S., Application of simulation and intelligent agents to solve project management problem International Journal of Computer Science Engineering and Information Technology Research, pp. 321-329; Goldberg, D., (1989) Genetic Algorithms, p. 412. , Addison Wesley; Aksyonov, K.A., Theory and practice of decision support tools (2001) Saarbrucken, LAP LAMBERT Academic Publishing GmbH & Co. KG, p. 341; Bezhitsky, S.S., Semenkin, E.S., Evolutionary algorithms to automate the design of distributed systems for information processing and management (2006) Proc. Tenth National Conference on Artificial Intelligence with International Participation (CAI-2006), 3, pp. 1005-1012. , Moscow |